Now showing items 21-40 of 83

    • Fisheries research component report on scientific findings July 1997 to June, 2002 

      Lake Victoria Environmental Management Project (LVEMP) (Lake Victoria Environmental Management Project (LVEMP), 2007)
      The Fisheries Research Component is being implemented under three sub-components namely Fisheries Biology and Biodiversity Conservation, Socio-economics, Aquaculture and Information and Database. The overall objective of ...
    • Identification and mapping of ecologically sentive areas(ESAS) in Lake Victoria 

      Lake Victoria Basin Commission (Lake Victoria Basin Commission, 2011)
    • The impact of natural disasters, due to environmental change, on the livelihood of the Lake Victoria basin 

      Opere, Alfred (Department of Meteorology University of Nairobi, 2004)
      The major forms of disasters include: Droughts, Floods, Terrorism, Landslides, HIV/AIDS and disease epidemics, Transport accidents, Fires/industrial hazards and pollution. There are other extreme outbreaks of diseases, ...
    • Integrated Soil and Water Conservation (ISWC) final report on lessons learnt 

      Liwenga, ET (Lake Victoria Environmental Management Project (LVEMP), 2005)
      Introduction The Lake Victoria Basin represents a good scenario of environmental problems related to human activities on land. Land degradation in the lake basin is of major concern, not only for the healthy of the lake, ...
    • Knowledge and experiences gained from managing Lake Victoria ecosystem 

      Lake Victoria Environmental Management Project (LVEMP) 2004 (Lake Victoria Environmental Management Project (LVEMP), 2014)
      Lake Victoria is considered one of the most important shared natural resource of Eastern Africa. The Lake Basin supports about 30 million people one million of whom are employed formally or informally in fish related ...
    • Lake Victoria Basin Commission Institutional Capacity Enhancement Program 

      Lake Victoria Basin Commission (Lake Victoria Basin Commission, 2013)
      To build the capacity of LVBC to provide sustainable leadership in the coordination of the stakeholders to attain the shared vision of the LVB
    • Lake Victoria Basin Knowledge Management Project 

      Lake Victoria Basin Commission (Lake Victoria Basin Commission, 2013)
      To establish an efficient and comprehensive Knowledge Management system at the Lake Victoria Basin Commission that will promote, facilitate and coordinate better and more sustainable development of the Lake Basin.
    • Lake Victoria Biodiversity Informatics Phase II(LAVIBI) 

      Lake Victoria Basin Commission (Lake Victoria Basin Commission, 2013)
    • Lesson learnt from land use management through Integrated Soil and Water Conservation (ISWC) 

      Biamah, Elijah K (Lake Victoria Environmental Management Project (LVEMP), 2005)
      River Nyando is one of seven major rivers within the Kenyan side of the Lake Victoria Drainage Basin. The other six rivers are Sio, Nzoia, Yala, Mara, Sondu-Miriu and Kuja- Migori. The Nyando and Nzoia rivers have been ...
    • Lessons learned on micro-projects 

      Nyirabu, Mohabe (Lake Victoria Environmental Management Project (LVEMP), 2005)
      As part of the effort to take stock of its work in implementing micro projects, consider future direction and envisage action to be undertaken, LVEMP engaged a National Consultant from the Faculty of Arts and Social Sciences ...
    • Lessons learnt in capacity building 

      Lake Victoria Environmental Management Project (LVEMP) (Lake Victoria Environmental Management Project (LVEMP), 2005)
      Lake Victoria and the overall Lake Basin (LB) is an ecoregion of local, national, regional and global importance. It supports the livelihoods of one third of the populations of the riparian countries and it can be a ...
    • Lessons learnt on catchment afforestation component of the Lake Victoria environmental management project 

      Chamshama, SAO (Lake Victoria Environmental Management Project (LVEMP), 2005)
      Lake Victoria is a shared water body by the three riparian countries of Kenya, Uganda and Tanzania. The lake covers a surface area of 68 800 km2 and catchment area of 184 000 km2 and supports approximately 30 million people. ...
    • Lessons learnt on community participation final report 

      Kessy, Flora (Lake Victoria Environmental Management Project (LVEMP), 2005)
      The study was commissioned by Lake Victoria Environmental Management Project (LVEMP) and was conducted from June to July 2005. The main purpose of the study was to generate a comprehensive and analytical report on Lessons ...
    • Lessons learnt: water hyacinyh control component 

      Sibuga, KP (Lake Victoria Environmental Management Project (LVEMP), 2005)
      The Water Hyacinth Control Component (WHCC) is one of the 10 components of LVEMP. The overrall goal of the components‟ focus is to control water hyacinth by reducing the weed to a manageable level. The approach chosen was ...
    • THE LVEMP COMMUNITY PARTICIPATION STRATEGY 

      Lake Victoria Environmental Management Project (LVEMP) (2004)
      Since its inception in 1997, the Lake Victoria Environmental Management Project (LVEMP) has made several efforts to integrate community participation across all project components. Success in implementation of community ...
    • Mara River Basin Integrated Natural Resource Management 

      Lake Victoria Basin Commission (Lake Victoria Basin Commission, 2012)
      LVBC has been implementing Mara River Basin Transboundary Water for Biodiversity and Human Health (in the Mara River Basin Project (TWBHH-MRB) in Mara river Basin since 2009. The project focus include: To promote trans-boundary ...
    • Mara river basin natural resources management institutional capacity needs assessment 

      Lake Victoria Basin Commission (Lake Victoria Basin Commission, 2011)
      This report deals with the Natural Resources Management Institutional Needs Assessment of the Mara River Basin. The report gives an inventory of the institutions dealing with natural resources management and a detailed ...
    • Mara River Basin Transboundary Integrated Water Resources Management and Development Project Mara River Basin Monograph 

      Water Resources and Energy Management (WREM) International Inc (2008)
      The Mara River Basin is shared between Kenya and Tanzania and covers seven districts: Nakuru, Bomet, Narok, Transmara, Serengeti, Tarime, and Musoma Rural. The river has a catchment area of about 13,750 km2, with an upper ...
    • Mara river basin-wide water allocation plan 

      Lake Victoria Basin Commission (Lake Victoria Basin Commission, 2013)
      The Mara River Basin (MRB) is an important hydrologic system that not only serves the bordering countries of Kenya and Tanzania, but also exists as a valuable input to Lake Victoria, the world’s second largest freshwater ...
    • Maritime Communications For Safety On Lake Victoria (MCSLV) 

      Lake Victoria Basin Commission (Lake Victoria Basin Commission, 2013)
      The project is designed around the 4th EAC Development Strategy (2011-2016) addressing the navigation safety intervention area and will contribute towards the provision of cheap, efficient, safe and environmentally ...