Search
Now showing items 1-5 of 5
Water quality and ecosystem status
(Lake Victoria Environmental Management Project (LVEMP), 2005)
The Winam Gulf’s aquatic environment (Figure 1) represents a considerable part of
the economic potential of the country, e.g. with regard to fisheries and navigation. However,
the use, the management and the preservation ...
Tanzania National Water Quality Synthesis Report
(Lake Victoria Environmental Management Project (LVEMP), 2005)
The Water quality and Ecosystem Management Component of the Lake Victoria
Environmental Management Project (LVEMP) in Tanzania for the past five years have
made a considerable progress towards understanding Lake Victoria ...
Preparation of National / Regional Management Framework: Institutional Component for the Lake Victoria Basin Final National Report January 2007-Tanzania
(Lake Victoria Environmental Management Project (LVEMP), 2007)
Management.of Lake Basin depends on Institutions. Institutions administer the laws and establish the policies and rules and even incentives for management of the resources within the basin. They include traditional ...
A Report on the Implementation Status of Lake Victoria Environmental Management Project in Kenya, Tanzania and Uganda from 1st July 1997 – 30th June 2002 and Way Forward
(Lake Victoria Environmental Management Project (LVEMP), 2002)
The Lake Victoria Environmental Management Project (LVEMP)
is a multi-discipline and multi-sector comprehensive development
programme that was designed to successfully introduce, through
implementation, environmentally ...
The Vision and Strategy Framework for Management and Development of Lake Victoria Basin
(Lake Victoria Environmental Management Project (LVEMP), 2003)
Lake Victoria is the world’s second largest fresh-water lake and the largest in Africa,
with a surface area of 68,800 km2. The Lake basin area covers 193,000 km2 with
Tanzania occupying 44 per pent, Kenya 22 per pent, ...